Works with the AI tools you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIGitHub CopilotGitHub CopilotGemini CLIGemini CLI+20 more

    Contractor Quote Decoder: Allowances & Change Orders

    2

    Decode a renovation quote to find the allowances that aren't prices and the exclusions that become change orders.

    $5

    Secure checkout via Stripe

    30-day refund guarantee

    Converts to your local currency at checkout

    0 installsSecurity scanned
    Contractor Quote Decoder: Allowances & Change Orders

    Contractor Quote Decoder: Allowances & Change Orders

    Example session with this skill installed

    Kitchen remodel quote, $48,500. Includes demo, cabinets (allowance $9,000), countertops (allowance $3,500), tile backsplash (allowance $600), plumbing and electrical 'as needed', painting. Excludes permits, appliances, flooring, and 'any structural work discovered.' Payment: 50% on signing, 40% at cabinet install, 10% on completion. I want mid-range shaker cabinets and quartz counters in a 180 sq ft kitchen. Decode this.

    • Read your context and instructions
    • Compiled the contractor quote decoder
    • Generated the document

    Contractor Quote Decode: kitchen remodel — $48,500

    1. The verdict
    Expect $56,000 to $63,000, not $48,500. The cabinet and countertop allowances are below mid-range shaker and quartz for a 180 sq ft kitchen, four required items are excluded, and the payment schedule has you 50% paid before any work exists. Ask for the allowance corrections and a milestone schedule before signing; the scope itself looks competent.

    2. Section decode

    SectionWhat it saysWhat it means / what's missingSeverity
    CabinetsAllowance $9,000Mid-range shaker for ~20 linear ft typically runs $12,000–$16,000🔴
    CountertopsAllowance $3,500Quartz for ~45 sq ft installed is typically $4,500–$6,500🟡
    BacksplashAllowance $600Plausible for basic tile; upgrades push it over🟢
    Plumbing/electrical"As needed"Undefined scope; every extra outlet is a change order🟡
    ExclusionsPermits, appliances, flooring, structuralFour separate bills to come🔴
    Payment50 / 40 / 10Half the money before demo; 90% before punch list🔴

    3. The allowance audit
    Cabinets: $9,000 vs $12,000–$16,000 realistic → overage $3,000–$7,000. Countertops: $3,500 vs $4,500–$6,500 → overage $1,000–$3,000. Backsplash: $600 vs $600–$1,200 → $0–$600.

    Overage subtotal: $4,000–$10,600.

    4. The silent-items list
    Permits ($400–$1,500) · flooring for 180 sq ft ($1,800–$4,000 installed) · appliance hookups if new appliances change locations · disposal fees if not in "demo" · sink and faucet (not listed under plumbing or countertops).

    5. Payment schedule read
    At signing you've paid $24,250 for nothing built. At cabinet install (typically 60% through) you've paid $43,650, about 90%. Exposure: if the contractor stalls after cabinets, you're holding 10% leverage for 40% of the work. Request: 10% deposit, 25% at demo complete, 25% at rough-in passed, 25% at cabinets and counters installed, 15% on completion and punch list.

    6. Making bids comparable
    Send every bidder: cabinet spec (line, door style, box construction, linear feet) · countertop material, sq ft, edge · exact inclusions list (permits, disposal, flooring, sink, faucet, appliance hookup) · a fixed plumbing/electrical scope · the same milestone payment schedule.

    This is a plain-language reading, not legal/financial advice — laws vary by jurisdiction; confirm anything load-bearing with a qualified professional.

    contractor-quote-decoder-allowances-chan.pdf

    PDF · document

    Generated

    Example file from a real run - the skill writes it into your workspace.

    Connects securely to your tools. The creator never sees your data.

    What you get

    The real expected cost range, not the quoted number.Every allowance audited against realistic costs at your finish grade.The silent items that will become change orders, listed in advance.A milestone-tied payment schedule to request, and the questions that make bids comparable.

    About this skill

    The problem

    A renovation quote looks like a price. It is usually a price plus allowances set too low, plus exclusions that surface as change orders, plus a payment schedule that has you paying ahead of the work. The final bill is 20 to 40 percent higher and nobody lied.

    What it does

    • Decodes the quote section by section: scope, materials, allowances, exclusions, schedule, payment terms.
    • Audits every allowance against realistic cost at your stated finish grade and subtotals the likely overage.
    • Lists the silent items the finished job needs that the document doesn't mention.
    • Reads the payment schedule for where you're exposed and proposes a milestone-tied restructure.
    • Produces the question set that makes competing bids comparable.

    Why this beats prompting it yourself

    A general prompt says whether the total seems reasonable. This skill computes the real expected range, names every future change order in advance, and gives you the questions that force bidders to price the same job.

    Use cases

    • Comparing three kitchen-remodel bids that don't line up.
    • Checking a bathroom quote before signing a contract.
    • Understanding why a 'fixed price' job went over.
    • Restructuring a payment schedule before the deposit.

    Known limitations

    Not legal advice, and not a substitute for a licensed estimator. Allowance benchmarks are order-of-magnitude and regional. A one-page quote for a large job is itself a finding; the skill decodes what's provided and names the missing sections.

    How to install

    Works the same in every agent - Claude, Cursor, Codex, Copilot and 20+ more.

    ~30 seconds
    1. 1

      Download the ZIP

      Free skills download straight away. Paid skills unlock right after purchase.

    2. 2

      Unzip into your skills folder

      Every agent reads skills from one folder on your machine. Drop the unzipped folder in there.

    3. 3

      Ask your agent to use it

      Restart the agent if it was already running. It picks the skill up automatically - no config needed.

    Skills folder by agent

    Click the path to copy it. Create the folder if it does not exist yet.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill passes our trust checks below.

    Security scanned

    Passed our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    30-day refund

    Not a fit? Get your money back

    Trust & safety

    Security scanned

    Verified clean 4 days ago

    • Passed all security checks, Safe to install

    Listed4 days ago

    What's inside

    Frequently Asked Questions