Works with the AI tools you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIMuseMuseDotsDots+22 more

    AI Construction Change Order Organizer

    1

    Transform messy construction change requests into professional, structured change order documentation and impact reports.

    $9.99

    Secure checkout via Stripe

    30-day refund guarantee

    Converts to your local currency at checkout

    Security scanned
    AI Construction Change Order Organizer

    AI Construction Change Order Organizer

    Example session with this skill installed

    Process this change request: Owner wants to swap the lobby tile (Spec 093000) for Grade B Polished Granite. Lead time is 4 weeks longer. Sub quoted $12k extra for material but labor is same.

    • Read your context and instructions
    • Compiled the ai construction change

    I have processed the lobby flooring change request. The following documentation summarizes the scope shift, cost impact, and schedule risks identified from your input.

    Change Order Analysis: CO-001 Lobby Flooring Substitution

    CategoryDetailsStatus
    Original ScopeSpec 093000 - Standard Ceramic TileReplaced
    New ScopeGrade B Polished GraniteProposed
    Cost Impact+$12,000.00 (Material Only)Unconfirmed
    Schedule Impact+4 Weeks (Procurement Lead Time)Potential Delay
    Primary TradeTile & Stone SubcontractorIdentified

    Scope Difference Analysis

    The request replaces standard ceramic tile with Grade B Polished Granite in the main lobby. While the installation method is noted as similar, the material weight and thickness of granite may require a review of the subfloor prep and adhesive specifications.

    Schedule & Procurement Review

    • Confirmed Impact: 4-week extension on material lead time.

    Potential Impact: Possible sequencing conflict with lobby furniture delivery and final painting if the floor completion moves into Month 4.

    • Missing Info: Impact on floor transition strips and threshold heights at elevator banks.

    Draft Change Order Description

    "Provide all labor, material, and equipment to substitute specified ceramic tile (Spec 093000) with Owner-selected Grade B Polished Granite in the Main Lobby. Change includes a $12,000.00 material cost increase. Installation labor remains per original contract. Note: This change extends the procurement period by four weeks; project milestone impacts to be determined upon approval."

    Impact Checklist & Open Questions

    • Technical: Verify if granite thickness requires grinding the slab or adjusting door clearances.
    • Documentation: Need formal quote from Stone Sub showing quantity breakdown.
    • Approval: Has the Architect reviewed the slip-resistance rating for the granite?
    • Question: Does the $12k include shipping and crating, or just the slabs?

    Next steps

    1. Request a formal itemized quote from the Subcontractor including freight.
    2. Send the slip-resistance data sheet to the Architect for safety approval.
    3. Update the Master Schedule to reflect the 4-week procurement delay.

    Connects securely to your tools. The creator never sees your data.

    About this skill

    Construction projects often stall because change requests are messy, incomplete, and lack the technical structure needed for approval. This skill transforms raw site notes, RFI responses, and field instructions into professional, review-ready change order documentation.

    What it does

    • Scope Analysis compares original and revised requirements to isolate added or removed work.
    • Affected Work Mapping identifies trade dependencies, material substitutions, and installation method changes.
    • Cost Organization structures supplied labor, equipment, and subcontractor quotes into a clear pricing summary.
    • Schedule Impact Review flags potential delays in procurement, lead times, and sequencing.
    • Draft Generation produces a professional Change Order description ready for stakeholder review.

    How it works

    1. Input raw request data, such as field reports, email requests, or updated drawings.
    2. Analysis begins as the skill compares the new scope against original specifications.
    3. Review the generated lists of missing documentation, unconfirmed costs, and schedule questions.
    4. Export the structured draft and impact checklist to your project management system.

    Frameworks & tools

    Works with any text-based input from Procore, Autodesk Construction Cloud, or Bluebeam. It outputs standard Markdown compatible with most project management platforms and document editors.

    Why this beats prompting it yourself

    Generic prompts often invent missing prices or overlook trade dependencies. This skill uses a strict logic gate to separate confirmed facts from assumptions, ensuring you never present "hallucinated" costs or dates to an owner.

    Use cases

    • Convert a chaotic email thread between a PM and Subcontractor into a formal CO draft.
    • Identify hidden schedule risks when a material substitution is requested mid-build.
    • Generate a missing-information checklist to send back to field teams for incomplete requests.

    Known limitations

    Does not provide legal advice or contractual entitlement determinations. It cannot calculate final pricing or schedule durations if the raw data is not provided.

    How to install

    Works the same in every agent - Claude, Cursor, Codex, Copilot and 20+ more.

    ~30 seconds
    1. 1

      Download the ZIP

      Free skills download straight away. Paid skills unlock right after purchase.

    2. 2

      Unzip into your skills folder

      Every agent reads skills from one folder on your machine. Drop the unzipped folder in there.

    3. 3

      Ask your agent to use it

      Restart the agent if it was already running. It picks the skill up automatically - no config needed.

    Skills folder by agent

    Click the path to copy it. Create the folder if it does not exist yet.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill passes our trust checks below.

    Security scanned

    Passed our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    30-day refund

    Not a fit? Get your money back

    Trust & safety

    Security scanned

    Verified clean 10 days ago

    • Passed all security checks, Safe to install

    Listed10 days ago

    What's inside

    Frequently Asked Questions