Works with the AI Agents you already use
wbs structure architect
Validates WBS structure for completeness and consistency, computes budget roll-ups, identifies gaps in descriptions and owners, produces a WBS dictionary. Decision support for project planning.
$1.99
wbs structure architect
Example session with this skill installed
Validate this WBS for Project Alpha. Currency is USD.
1 Project Alpha, Budget 5000
1.1 Design, Budget 2000, Owner: Alice
1.2 Dev, Budget 2500, Owner: Bob
1.2.1 Frontend, Budget 1000
1.2.2 Backend, Budget 2000
- Read your context and instructions
- Compiled the wbs structure architect
The WBS validation for Project Alpha is complete. A budget mismatch was identified in the development branch.
WBS Validation Report — Project Alpha
1. WBS summary
- Element Count: 5
- Work Package Count: 3
- Max Depth: 3
- Total Budget: 5000.00 USD
- Completeness Score: 80%
- Assumptions: Budget for 1.2.1 and 1.2.2 sourced from user input (E1).
2. WBS dictionary
| Code | Name | Level | Type | Owner | Budget |
|---|---|---|---|---|---|
| 1 | Project Alpha | 1 | Summary | - | 5000.00 |
| 1.1 | Design | 2 | Work Package | Alice | 2000.00 |
| 1.2 | Dev | 2 | Summary | Bob | 2500.00 |
| 1.2.1 | Frontend | 3 | Work Package | - | 1000.00 |
| 1.2.2 | Backend | 3 | Work Package | - | 2000.00 |
3. Budget roll-up verification
Code 1.2 (Dev): Mismatch detected. Parent budget (2500.00) does not equal sum of children (3000.00). Difference: -500.00.
- Code 1 (Project Alpha): Parent budget (5000.00) equals sum of children (2000.00 + 3000.00 = 5000.00).
4. Completeness gaps
- 1.2.1: Missing Owner, Missing Description.
- 1.2.2: Missing Owner, Missing Description.
5. Validation findings
- 1.2: [WARN_ROLLUP] Budget roll-up discrepancy in child elements.
- 1.2.1: [INFO_MISSING] Field 'owner' is null.
6. Recommendations and items for human review
Information gap — organizational validation required: Assign owners to work packages 1.2.1 and 1.2.2 to ensure accountability.
Management decision required: Resolve the $500 budget discrepancy in the Dev branch (1.2) before finalizing the baseline.
Next steps
- Update owners for the frontend and backend work packages.
- Reconcile the budget for element 1.2 to match the sum of its sub-tasks.
- Rerun validation to confirm the completeness score reaches 100%.
Connects securely to your tools. The creator never sees your data.
About this skill
Managing project scope through a Work Breakdown Structure (WBS) often leads to silent errors: broken hierarchies, missing owners, and budget roll-ups that do not add up. This skill automates the structural validation and financial reconciliation of your WBS. It ensures every work package is accounted for and every parent element correctly reflects the sum of its children.
What it does
- Structure validation checks hierarchical dot notation for consistency and logical nesting.
- Budget roll-up verification calculates parent budgets against children sums to identify financial discrepancies.
- Completeness auditing flags elements missing critical metadata like owners, descriptions, or durations.
- WBS dictionary generation produces a structured table of elements, levels, and types for project documentation.
- Gap reporting isolates specific codes where information is missing or structural rules are violated.
How it works
- Input your list of WBS elements, including codes (e.g., 1.1.2), names, and optional budgets or owners.
- The skill maps your data to a schema and executes a deterministic validation script to check for errors.
- Review the generated report covering summary stats, the full dictionary, and budget mismatches.
- Address flagged items marked for human review or management decision.
Frameworks & tools
Uses a deterministic Python validation engine to enforce hierarchical consistency and financial accuracy without manual calculation errors.
Why this beats prompting it yourself
Generic prompts often struggle with multi-level math and strict dot-notation logic. This skill uses a code-based backend to ensure that budget totals and hierarchy depths are mathematically exact, not estimated.
Use cases
- Auditing a draft WBS for missing owners or descriptions before project kickoff.
- Verifying that sub-task budgets correctly roll up to the total project budget.
- Generating a formal WBS dictionary from a raw list of tasks and codes.
- Identifying structural breaks in complex, multi-level project hierarchies.
Known limitations
Does not support critical path analysis, schedule development, or automatic WBS generation from text descriptions. Requires WBS codes in dot notation.
Find more skills like this on the Claude Skills Marketplace, the Codex Skills Marketplace and the Gemini Skills Marketplace, or browse All Claude Skills.
Requires WBS codes in dot notation. Does not perform scheduling, resource leveling, or diagram generation. Validates provided data only.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before buying a skill.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
Fresh listing
Recently published to Agensi
Money-back guarantee
Doesn't do what its page promises? You get your money back.
Trust & safety
Security scan
Security scan passed today