Review a proposed scope, backlog or schedule change against the baseline, identify which committed deliverables and milestones it touches, and route the decision to the right approver.
Free
Works with the AI Agents you already use
Review a Change Request
Example session with this skill installed
Review this change request: The client wants to add a 'dark mode' toggle to the MVP. Our MVP baseline is a fixed launch on Oct 1st. Current milestones: UI Alpha (Aug 1), Beta (Sept 1). PM approves UI.
- Read your context and instructions
- Compiled the review a change
I have analyzed the request to add a 'dark mode' toggle against your MVP baseline.
Change: Add 'dark mode' toggle functionality to the MVP release.
Needs approval? Yes, because it adds new work to the UI Alpha (Aug 1) and Beta (Sept 1) milestones, which are currently committed as fixed-date deliverables.
| Committed item affected | How | Evidence |
|---|---|---|
| UI Alpha Milestone | Adds scope | Requires new CSS variables and theme architecture not in baseline. |
| MVP Launch (Oct 1) | Risk of delay | Adds estimated 3 days of dev and 2 days of QA to a fixed-date schedule. |
| Accessibility Specs | Changes scope | Dark mode requires a new set of contrast audits for the UI deliverable. |
Effect: Adds approximately 5 total man-days of effort. Without increasing capacity, this pushes the UI Alpha milestone out by 1 week, potentially impacting the Oct 1st launch.
Route to: Product Manager (PM), by July 20th (to avoid UI Alpha slip)
Options:
- Option 1: Accept as is. Move MVP launch to Oct 8th.
- Option 2: Accept and trade out. Remove 'User Profile Customization' from MVP to free up dev cycles.
- Option 3: Defer. Move Dark Mode to Phase 2 (Post-MVP).
- Option 4: Decline. Stick to the original high-contrast light theme baseline.
People side: Frontend team needs updated theme specs; QA needs new test cases for theme switching.
Next steps
- Confirm if the 'User Profile' trade-out is acceptable to the stakeholder.
- Present the updated UI Alpha timeline to the engineering lead for validation.
Connects securely to your tools. The creator never sees your data.
About this skill
Managing scope creep manually leads to missed milestones and budget overruns. This skill analyzes proposed backlog changes against your project baseline to identify hidden impacts on committed dates and deliverables. It filters out minor adjustments from critical scope shifts, ensuring only significant changes reach the steering committee.
What it does
- Scope Analysis identifies if a change alters committed deliverables or shifts agreed-upon project boundaries.
- Milestone Tracking flags any modification that moves a committed date or adds work to unfinished milestones.
- Impact Evidence generates a structured breakdown of affected items backed by project data.
- Approval Routing determines the correct decision-maker based on the change type and project governance.
- Option Generation provides categorized paths including trade-offs, deferrals, and rejections.
How it works
- Input Baseline by providing current committed milestones, deliverables, and the proposed change description.
- Impact Assessment triggers a check against the four criteria for formal approval, such as moving committed dates or changing scope definitions.
- Draft Routing assigns the request to the relevant approver with a clear "Yes/No" recommendation for formal review.
- Evaluate Options to view the trade-offs, including specific "trade-out" suggestions to maintain the schedule.
Frameworks & tools
This skill is framework-agnostic and works with backlog data from Jira, Linear, or plain text scope statements and milestone lists.
Why this beats prompting it yourself
Generic prompts often miss the nuance between a "clarification" and a "scope change." This skill enforces a specific evidence-based method to prevent false positives for approval while catching subtle milestone shifts that humans often overlook.
Use cases
- Evaluate a "can we just add" request from a stakeholder mid-sprint.
- Audit a backlog re-prioritization to see if it breaks committed launch dates.
- Route scope changes to the correct PM or Steering Committee member.
- Draft the trade-off options for a re-scoping proposal.
Known limitations
Requires a clearly defined baseline of milestones and deliverables to function. It cannot calculate budget impact without provided cost or effort data.
Find more skills like this on the Claude Skills Marketplace, the Codex Skills Marketplace and the Gemini Skills Marketplace, or browse Claude Skills for Business & Operations.
Requires predefined milestones and deliverables. Cannot calculate effort or cost without provided capacity or rate data. Does not store project history between sessions without manual input.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before buying a skill.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
Fresh listing
Recently published to Agensi
Free to use
No account required to browse
Trust & safety
Security scan
Security scan passed today
- Free with an Agensi account
Permissions
No special permissions declared or detected