Works with the AI Agents you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIMuseMuseDotsDots+22 more

    Flipping/Rehab Budget Estimator Skill

    1

    Convert property inspection notes into categorized rehab budgets with localized costs and structural risk flags.

    $3.99

    Secure checkout via Stripe

    Money-back guarantee

    Converts to your local currency at checkout

    Security scanned
    Flipping/Rehab Budget Estimator Skill

    Flipping/Rehab Budget Estimator Skill

    Example session with this skill installed

    Property Details: 3 bed, 2 bath SFH, 1500 sqft. Built 1950. Market Location: Atlanta, GA Cost Range Preference: Mid-tier (Rental grade, durable but cost-effective materials) Inspection Notes: Smells like mold in the basement. Heavy horizontal crack on the east foundation wall. Kitchen is super dated, needs new cabinets and appliances. Hardwood floors under the carpet look okay but need refinishing. Bathroom 1 has a leaky toilet. HVAC looks like it's from the 90s and makes a weird rattling sound. Needs fresh paint everywhere.

    • Read your context and instructions
    • Compiled the flipping rehab budget

    🚨 HIGH-RISK FLAGS (MARGIN KILLERS)

    MARGIN KILLER: Heavy horizontal crack, east foundation wall. Horizontal cracking typically indicates lateral soil pressure and is the most serious crack pattern in a 1950s block or masonry foundation. Left unaddressed, it can lead to inward bowing, water intrusion, and eventual wall failure. It also affects appraisal, financing, and resale. A licensed structural engineer must evaluate before purchase or closing. Repair scope ranges from carbon-fiber strapping (low end) to wall excavation and rebuild or helical tiebacks (high end). The budget below carries a mid-range allowance only.

    MARGIN KILLER: Suspected mold in the basement. The odor suggests an active moisture source, possibly linked to the foundation crack. Remediation cost depends on the extent of growth, and it is pointless unless the water source is fixed first. Get a mold/moisture assessment (air and surface testing) and a disclosure review. Mold can also trigger lender or insurer scrutiny.

    • MARGIN KILLER (conditional): HVAC from the 1990s with abnormal rattling. The rattling may indicate a failing blower motor, compressor, or bearings. Assume full replacement. Also have the ductwork and any gas heat exchanger inspected for cracks or carbon monoxide risk.
    • Hidden-condition risk (not flagged in notes, typical for a 1950 build): possible lead paint (pre-1978), asbestos in flooring, adhesives, or pipe wrap, galvanized or cast-iron supply and drain lines, and ungrounded or outdated electrical (knob-and-tube, cloth-wrapped wiring, or a 60-100A panel). None are confirmed, but all should be inspected before the budget is locked. The contingency line below is sized with this in mind.

    📋 REHAB BUDGET ESTIMATE

    Basis: Atlanta, GA metro; mid-tier, rental-grade finishes; 1,500 sq ft SFH. Figures are planning estimates, not bids. Get 2-3 contractor quotes.

    CategoryLine Item / DescriptionPriority (High/Med/Low)Estimated Cost ($)
    StructuralStructural engineer evaluation and report (east foundation wall)High$ 800
    StructuralEast wall foundation repair allowance (carbon-fiber straps or wall anchors; excludes full rebuild)High$ 9,500
    Basement / MoistureMold/moisture assessment and testingHigh$ 600
    Basement / MoistureMold remediation (assumes localized to moderate growth)High$ 4,500
    Basement / MoistureWater management: exterior grading and gutters, sump pump or perimeter drain allowanceHigh$ 4,000
    Mechanical/HVACFull HVAC system replacement (furnace/air handler, condenser, line set; ~2.5-3 ton)High$ 9,500
    Mechanical/HVACDuctwork inspection and sealing/repair allowanceMed$ 1,500
    PlumbingBathroom 1 toilet: replace unit, wax ring, supply line, check subfloor for rotHigh$ 450
    PlumbingGeneral plumbing inspection (camera scope of main line, supply line check)Med$ 400
    InteriorKitchen cabinets (rental-grade, ~10x10 layout), installedMed$ 6,500
    InteriorKitchen countertops (laminate or entry-level quartz/butcher block), installedMed$ 2,200
    InteriorKitchen appliance package (range, refrigerator, dishwasher, microwave)Med$ 3,600
    InteriorKitchen sink, faucet, backsplash, and misc. plumbing/electricalLow$ 1,500
    InteriorRemove carpet; refinish hardwood floors (~1,200 sq ft; sand, stain, 2 coats poly)Med$ 5,000
    InteriorHardwood spot repair/board replacement allowanceLow$ 800
    CosmeticInterior paint, walls/ceilings/trim/doors (1,500 sq ft, 2 coats)Med$ 5,000
    CosmeticLight fixtures, switches/outlets, hardware, door stopsLow$ 1,200
    CosmeticBathroom refresh (vanity/fixtures, caulking, regrout), both bathsLow$ 2,500
    ExteriorExterior touch-up allowance (not noted in inspection; verify roof, siding, windows)Low$ 1,500
    Permits / Soft CostsPermits, dumpster, debris removal, and cleaningMed$ 2,500
    Contingency15% contingency (elevated for 1950 build, foundation and mold unknowns)High$ 10,800
    ESTIMATED TOTAL (before any full foundation rebuild)$ 74,350

    Subtotal before contingency: $ 63,550 (subtotals above rounded; contingency applied at ~15%).

    Scenario range:

    Best case (engineer confirms minor, stable crack; mold is localized; no hidden electrical/plumbing issues): ~$ 60,000

    • Base case (as modeled above): ~$ 74,000

    Worst case (wall rebuild or excavation at $ 20,000-40,000+, electrical/plumbing upgrades, asbestos abatement): $ 100,000-130,000+

    💡 PROJECT MANAGER'S NOTES

    1. Do not finalize the purchase price until the structural engineer and mold assessment are back. The east wall crack and basement moisture are likely related. Use the reports as negotiating leverage, or walk away if the engineer calls for a full wall rebuild. Sequence the work correctly: stabilize the foundation, fix the water source, remediate the mold, and only then spend on cosmetics.

    Order of operations protects the finish spend. Do not refinish floors or paint until structural, moisture, HVAC, and plumbing work is complete. Test for lead paint and asbestos before sanding floors or disturbing 1950-era materials. Lead-safe work practices (EPA RRP) apply to renovation of pre-1978 housing by contractors.
    3.

    The cosmetic scope is the healthy part of this deal. Hardwoods under the carpet and a standard kitchen refresh are lower-risk, predictable costs. The profit hinges on the structural and moisture outcome. Run your max allowable offer (ARV x target % minus rehab minus holding and closing costs) using the base-case and worst-case totals, and only proceed if the deal still pencils at the worst case or the price reflects it.

    Estimates are planning-level approximations based on typical Atlanta-area costs and are not contractor bids or engineering opinions. Prices vary by contractor, scope, and material selection.

    Connects securely to your tools. The creator never sees your data.

    About this skill

    Property investors lose thousands when hidden structural issues or inaccurate rehab estimates derail a deal. This skill converts raw inspection notes, walkthrough transcripts, and market data into a structured, categorized budget estimate. It enforces a systematic review process that prioritizes repairs and flags high-risk "margin killers" before they become expensive surprises.

    What it does

    • Risk Identification identifies and flags critical structural or systemic failures like foundation issues or outdated wiring.
    • Cost Estimation calculates localized line-item costs based on your specific market and finish quality preferences.
    • Logical Categorization groups repairs into phases such as Mechanical, Exterior, and Cosmetic for project planning.
    • Priority Mapping assigns urgency levels to every repair item to help sequence the renovation workflow.

    How it works

    1. Ingest Property Data provide the location, property type, and your desired finish level (low, mid, or high).
    2. Process Raw Notes paste inspection reports, site walkthrough transcripts, or rough bulleted lists of defects.
    3. Analyze and Map the skill categorizes the raw data and applies localized cost projections to each item.
    4. Review Report receive a structured table ready for presentation to lenders or investment partners.

    Frameworks & tools

    This skill is designed for real estate investors, wholesalers, and project managers using AI agents to automate property underwriting and renovation planning.

    Why this beats prompting it yourself

    Standard prompts often miss structural risks or leave cost columns blank. This skill uses a strict "Margin Killer" flagging system and localized cost modeling to ensure estimates are realistic and investor-ready.

    Use cases

    • Fix and Flip Underwriting generate quick budget drafts to determine if an asking price supports a profitable flip.
    • Wholesale Deal Packaging create professional repair lists to include in deal walkthroughs for buyers.
    • Lender Reporting produce categorized budget templates required for hard-money or bridge loan approvals.

    Known limitations

    Estimates are projections based on provided inputs and do not replace formal quotes from licensed contractors. Specific local building code requirements are not verified.

    How to use

    Skills on Agensi run inside your AI agent. Copy the prompt, paste it into your agent, and it connects to Agensi and installs this skill for you. If a payment is needed, your agent shows it to you first.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill passes our trust checks below.

    Security scanned

    Passed our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    Money-back guarantee

    Doesn't do what its page promises? You get your money back.

    Trust & safety

    Security scanned

    Verified clean 1 day ago

    • Passed all security checks, Safe to install

    Listed1 day ago

    What's inside

    Frequently Asked Questions