Find Capacity Conflicts

    1

    Add up each person's allocated hours across projects and find who is over capacity, in which weeks and by how much, with a trade-off for the director to decide.

    Free

    Security scanned

    Works with the AI Agents you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIDeepSeekDeepSeekMuseMuse+22 more

    Find Capacity Conflicts

    Example session with this skill installed

    Check these for conflicts. Standard is 40h.
    Project Alpha: Sarah 30h/wk (Oct 1-Nov 15).
    Project Beta: Sarah 20h/wk (Oct 15-Dec 1).
    Project Gamma: James 40h/wk (Nov 1-Nov 30).

    • Read your context and instructions
    • Compiled the find capacity conflicts

    I have analyzed the allocations for Sarah and James. There is a significant capacity conflict for Sarah during the overlap of Project Alpha and Project Beta.

    Capacity Conflict Report

    PersonWeeksAllocated (sum)AvailableOver byProjects
    SarahOct 15 to Nov 1530 + 20 = 504010 h/weekAlpha (30), Beta (20)
    JamesNov 1 to Nov 3040400 h/weekGamma (40)

    Trade-offs for the director:

    Sarah (Option A): Delay the start of Sarah's involvement in Project Beta until Nov 16. This protects the Alpha delivery date but pushes the Beta timeline back by four weeks.

    Sarah (Option B): Reduce Sarah's contribution to Project Alpha to 20h/week and Beta to 20h/week. This keeps both moving but likely extends the milestones for the Alpha migration.

    Sarah (Option C): Accept the 50h/week load for the 4-week burst period. This risks burnout but maintains all current project deadlines.

    Couldn't include:

    • None. All provided allocations had valid names, hours, and dates.

    Next steps

    1. Confirm if Sarah can handle a 4-week burst or if we should trigger Option A.
    2. Provide any planned leave for November to see if James's 40h allocation becomes a conflict.
    3. Add any internal or administrative tasks (meetings, etc.) that might reduce available hours below 40.

    Connects securely to your tools. The creator never sees your data.

    About this skill

    Resource management often fails because projects are viewed in isolation. A lead developer might be assigned 20 hours to a migration and 25 hours to a feature build, creating a silent 5-hour deficit that leads to burnout and missed deadlines. This skill identifies those overlaps by aggregating data across multiple staffing plans or timesheets.

    What it does

    • Aggregate allocations by summing hours per person across all active projects within the same time window.
    • Calculate capacity against user-defined standard work weeks to identify precise hourly overages.
    • Identify conflict windows by reporting the specific start and end dates where resource limits are exceeded.
    • Generate trade-offs by providing concrete options for directors, such as shifting dates or reallocating tasks.
    • Validate data integrity by flagging ambiguous names or entries with missing dates to ensure calculation accuracy.

    How it works

    1. Gather data: Provide project allocations including names, hours, and date ranges.
    2. Define constraints: Specify the standard weekly hours and any planned leave.
    3. Analyze overlaps: The skill sums concurrent project loads and compares them to availability.
    4. Review report: Examine the conflict table and proposed management options.

    Frameworks & tools

    This skill processes structured text, Markdown tables, and CSV-style data pasted from project management tools like Jira, Monday.com, or Excel.

    Why this beats prompting it yourself

    Manual capacity checks are prone to calculation errors and missed date overlaps. This skill enforces a strict "one row per person per period" methodology that ensures every conflict is surfaced with actionable business trade-offs rather than just raw data.

    Use cases

    • Auditing a new quarterly staffing plan for hidden double-bookings.
    • Resolving resource contention when two project managers claim the same engineer.
    • Planning for team leave to see if remaining staff can cover the workload.
    • Identifying peak "crunch" periods before they happen.

    Known limitations

    Does not automatically sync with external APIs; requires pasted data. If date or hour fields are missing, those items are excluded from totals and listed as warnings.

    Find more skills like this on the Claude Skills Marketplace, the Codex Skills Marketplace and the Gemini Skills Marketplace, or browse Claude Skills for Business & Operations.

    Requires manual data input. Items with missing dates/hours are excluded from sums. Ambiguous names must be manually confirmed. No native API integrations.

    How to use

    1. 1

      Connect your agent to the Agensi MCP

      Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup

    2. 2

      Sign in to Agensi

      Your agent shows a sign-in link. Sign in and click Allow.

    3. 3

      Ask for what you need

      Your agent loads this skill and uses it on your task. It always asks before buying a skill.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill goes through the trust checks below.

    Security scanned

    Checked by our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    Free to use

    No account required to browse

    Trust & safety

    Security scan

    Security scan passed today

    • Free with an Agensi account

    Permissions

    No special permissions declared or detected

    Listedtoday

    What's inside

    Frequently Asked Questions

    This skill identifies hidden 'double-booking' scenarios where a team member is assigned to multiple projects simultaneously, causing their total hours to exceed their weekly capacity. It translates these data points into actionable trade-off options for management.

    The skill is designed for use with any Large Language Model (LLM) that supports structured text analysis, including ChatGPT, Claude, and Gemini. It works best when provided with data in Markdown, CSV, or list formats.

    No complex installation or API keys are required. Simply add the skill to your agent's library and paste your project allocation data directly into the chat interface to begin the analysis.

    Your purchase includes the core logic for multi-project aggregation, conflict window identification, and the trade-off generation module, along with a guide on how to format your input data for the best results.

    The skill includes a data validation step that flags ambiguous names or missing dates as warnings. It will still calculate totals for all complete data sets while alerting you to specific rows that need manual correction.

    New in Business & Operations

    Free