estimate accuracy calibrator

    1

    Converts raw engineering estimates into calibrated P10/P50/P90 probability distributions using historical evidence.

    $5

    Secure checkout via Stripe

    Money-back guarantee

    Converts to your local currency at checkout

    Security scanned

    Works with the AI Agents you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIMuseMuseDotsDots+21 more

    estimate accuracy calibrator

    Example session with this skill installed

    Calibrate this estimate: 10 days for a new payment gateway integration. Historicals show a 1.4x median overrun on integrations (N=5). Drivers: API docs are messy, team is new to this gateway.

    • Read your context and instructions
    • Compiled the estimate accuracy calibrator

    I have processed the payment gateway integration estimate using the calibration framework. I applied a 1.4x historical multiplier and adjusted for the "New Domain" class quality and documented uncertainty drivers.

    Calibrated Forecast: Payment Gateway Integration

    1. Original Estimate (Preserved)

    10.0 days (Inside-view anchor)

    2. Historical Reference Data

    MetricValueNotes
    Sample Size (N)5Low confidence due to small N
    Median Overrun140% (1.4x)Baseline for comparable integrations
    P90 Overrun195% (1.95x)Worst-case historical performance
    Data Quality0.60Moderate; relevant but limited sample

    3. Calibration Adjustments

    FactorAdjustmentImpact
    Class: New Domain+50%High novelty architecture risk
    Driver: Messy Docs+20%Search/debugging overhead
    Driver: New Team+15%Ramp-up time
    Combined Multiplier2.25xCompounded uncertainty

    4. Calibrated Forecast Distribution

    PercentileForecastProbability
    P10 (Best Case)14.5 days10% chance of finishing earlier
    P50 (Median)22.5 daysMost likely outcome
    P90 (High Conf)31.0 days90% chance of finishing within this

    5. Commitment Threshold Test

    • Target: 10 days (Original Estimate)
    • Probability of Success: < 5%
    • Risk Level: EXTREME. The target falls well below the P10.

    6. Controlling Uncertainty

    Class Quality (New Domain) is the primary driver, contributing ~45% of the total range width. Reducing this through a 1-day spike would significantly tighten the forecast.

    7. Forecast vs. Promise Separation

    Evidence-Based Forecast
    22.5 days (P50) to 31.0 days (P90). The data suggests the current 10-day target is mathematically improbable.

    Recommended Promise
    28 days. This provides a 75% confidence level while allowing for the documented documentation and team experience risks.

    Next steps

    1. Conduct a 24-hour technical spike to reduce the "New Domain" uncertainty.
    2. Review the P90 with stakeholders to negotiate a realistic buffer.
    3. Update the forecast once the API documentation has been fully audited.

    Connects securely to your tools. The creator never sees your data.

    About this skill

    The problem

    Engineering estimates are often based on the "inside view," leading to systemic underestimation and missed deadlines. Developers struggle to account for hidden complexity, historical overruns, and external dependencies when pressured to provide a single number.

    What it does

    • Preserves the original anchor estimate while applying evidence-based calibration.
    • Calculates P10, P50, and P90 probability distributions based on historical overrun factors and class quality.
    • Decomposes uncertainty into specific drivers like requirement volatility and dependency risk.
    • Tests commitment thresholds to determine the statistical probability of meeting a hard deadline.
    • Separates the evidence-based forecast from the external promise to prevent conflating data with commitments.

    Why this beats prompting it yourself

    General prompts usually result in vague "add a 20% buffer" advice. This skill uses a structured mathematical framework to decompose uncertainty and apply historical reference class forecasting, providing a defensible audit trail for why a project might take longer than originally guessed.

    Use cases

    • Calibrating a sprint plan before committing to a hard release date.
    • Evaluating the risk level of a high-novelty R&D project with no clear precedent.
    • Presenting a data-backed range to stakeholders instead of a single, fragile date.
    • Identifying which specific technical unknown is creating the most scheduling risk.

    Known limitations

    Requires honest inputs regarding historical data quality. Forecast accuracy scales with the quantity of comparable historical data points provided.

    Requires historical estimate-to-actual data or class quality labels to function. Reliability decreases if team capacity is highly volatile or undefined.

    How to use

    1. 1

      Connect your agent to the Agensi MCP

      Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup

    2. 2

      Sign in to Agensi

      Your agent shows a sign-in link. Sign in and click Allow.

    3. 3

      Ask for what you need

      Your agent loads this skill and uses it on your task. It always asks before any payment.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill goes through the trust checks below.

    Security scanned

    Checked by our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    Money-back guarantee

    Doesn't do what its page promises? You get your money back.

    Trust & safety

    Security scan

    Security scan passed 2 months ago

    Permissions

    No special permissions declared or detected

    Listed2 months ago

    What's inside

    Frequently Asked Questions

    This skill uses a mathematical framework to transform single-point engineering estimates into P10/P50/P90 probability distributions, correcting for common biases like the 'inside view' and systemic underestimation.

    It requires the initial raw estimate, a description of the task, and any available historical data or risk factors (like dependency complexity) to calculate the calibrated forecast.

    The skill is designed to work with any LLM-based agent capable of structured reasoning and is compatible with most major project management AI platforms.

    You will receive the core skill logic for your AI agent, a guide on how to provide reference class data, and a template for presenting the resulting probability ranges to stakeholders.

    The calibrator identifies specific uncertainty drivers, such as requirement volatility or technical debt, helping you pinpoint exactly which risks are most likely to cause a deadline overrun.

    While it performs best with historical data, the skill includes a 'low-information' mode that uses industry-standard reference class forecasting to provide a baseline calibration for R&D projects.

    New in Business & Operations