- Home
- Skills
- Legal & Compliance
- Análise Inteligente de Edital em 48h
Análise Inteligente de Edital em 48h
Automated 8-step tender analysis and risk assessment workflow for government contractors.
$9.99
Works with the AI Agents you already use
Análise Inteligente de Edital em 48h
Example session with this skill installed
Analise este edital e me diga se vale a pena participar: [texto do edital], orçamento máximo R$ 120.000,00, setor EPIs e segurança, prazo final 15/10/2026, início 08/09/2026.
- Read your context and instructions
- Compiled the an lise inteligente
Summary
Rodei os 8 passos encadeados sobre o edital. Recomendação: Participar, com risco financeiro médio.
| Dimensão | Resultado | Peso |
|---|---|---|
| Documentação | completa, sem gaps | 40% |
| Risco financeiro | médio (R$ 120.000,00) | 30% |
| Histórico de projetos | satisfatório | 30% |
| Pontuação total | 100 / 100 | — |
Aderência (Passo 6)
{
"pontuacao_total": 100,
"gap_documentacao": [],
"risco_financeiro": "média",
"recomendacao": "Participar"
}
Documentação conferida contra a habilitação do edital: Certidão de Regularidade Fiscal, ISO 9001, comprovação de estoque mínimo de 10.000 unidades, Anexos III e IV. Faixas de risco aplicadas: alta acima de R$ 500 mil, média entre R$ 100 mil e R$ 500 mil, baixa abaixo de R$ 100 mil.
Recomendação estratégica (Passo 7)
{
"decisao": "Participar",
"pontos_fortes": [
"Certificado de Qualidade ISO 9001",
"Comprovação de estoque mínimo de 10.000 unidades",
"Combinação competitiva de qualidade e preço"
],
"pontos_fracos": [
"Risco de não entrega dentro do prazo estabelecido",
"Gestão financeira para manter o valor máximo"
]
}
Regra de decisão aplicada: pontuação >= 70 e risco financeiro diferente de "alto" → Participar.
Cronograma (Passo 5)
| Etapa | Início | Fim | Responsável |
|---|---|---|---|
| Levantamento de documentos | 2026-09-08 | 2026-09-09 | Assistente Administrativo |
| Elaboração da proposta | 2026-09-10 | 2026-09-14 | Equipe Técnica |
| Revisão jurídica | 2026-09-15 | 2026-09-16 | Departamento Jurídico |
| Preparação dos anexos | 2026-09-17 | 2026-09-20 | Equipe Técnica |
| Revisão final e ajustes | 2026-09-21 | 2026-09-22 | Coordenação do Projeto |
| Envio da proposta | 2026-09-23 | 2026-09-23 | Coordenação do Projeto |
Verificações automáticas: nenhuma sobreposição de datas, cada etapa com no mínimo 1 dia útil, cronograma inteiro dentro do intervalo entre início e prazo final. Envio em 23/09, com 22 dias de folga sobre o prazo de 15/10.
Next steps
- Revisar a matriz de risco antes de precificar a proposta.
- Fechar os documentos do checklist de habilitação na ordem do cronograma.
- Rodar o Passo 8 para gerar o plano do relatório de viabilidade em PDF.
Connects securely to your tools. The creator never sees your data.
About this skill
The problem
Evaluating a public tender document is slow, manual and easy to get wrong. Missing a single certification or misreading a delivery window turns into a disqualification, or into a contract you win and lose money on.
What it does
An 8-step chained workflow. Each step consumes the output of the previous one, so the legal extraction feeds the risk matrix, and the risk matrix feeds the go/no-go decision.
- Extracts structured data from raw tender text: mandatory legal, technical and fiscal requirements.
- Builds a risk matrix covering disqualification probability, financial exposure against your budget ceiling, and timeline feasibility.
- Maps potential competitors by sector, revenue band and existing certifications.
- Produces a Go/No-Go recommendation from a weighted score: 40% documentation, 30% financial risk, 30% project history.
- Builds an action roadmap with non-overlapping deadlines that finishes before the submission limit.
- Outputs a plan for a viability report (cover, executive summary, risk matrix, habilitation checklist, Gantt, competitor table).
Why this beats prompting it yourself
A single prompt flattens the dependency chain between legal requirements and operational capacity. Here the steps are explicit and ordered, each one states its own quality criteria, and each one defines what to return when the input is incomplete instead of guessing. You still review the output, but the workflow tells you which step produced each number.
What you provide
The tender text, your budget ceiling, your sector, the start date and final deadline, and your company data (registration number, certifications, project history). Everything else is produced by the workflow itself.
Requires specific company data (CNPJ, certifications) for accurate adherence scoring. Maximum tender text processing limit is 5MB. Competitor mapping may use placeholders if data is unavailable.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before any payment.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
Fresh listing
Recently published to Agensi
Money-back guarantee
Doesn't do what its page promises? You get your money back.
Trust & safety
Security scan
Security scan passed 1 month ago
Permissions
No special permissions declared or detected